This figure shows a batch job that contains two chunk steps, a task step and a decision element. The job starts with chunk step A, continues with chunk step B, and then decision element D evaluates condition 1. The condition is based on the status of step B. If condition 1 is true, the job terminates; otherwise the job continues with step C and then the job ends.